StageDesigner

Lengths, standard segments and cables in the report

How the app calculates the required cable length with allowance and loops, how it picks standard lengths and what goes into the cabling report.

3 min read
Documentation contents ▾

The cable length in the plan is the length you take out of the warehouse, not just the route length. The app adds loops at the ends and a percentage allowance, then rounds up to the standard length for that type.

Required length formula

Required length = (route + loops at both ends) × (1 + allowance). The allowance is calculated in proportion to the floor and truss parts of the route.

ParameterDefaultWhere to change
Floor allowance10 %Wizard → Rules → Floor allowance (0–50 %)
Truss allowance15 %Wizard → Rules → Truss allowance (0–50 %)
Service loop on truss0.5 mWizard → Rules → Service loop (0–5 m)
Loop in rack and at power connection1 mfixed
Floor loop0.3 mfixed
Loop between devices on truss0.2 m per endfixed

The loop depends on where the end is: distribution boards, LED processors, DMX nodes and splitters and control room devices get a rack loop, devices above 2 m a truss loop, the rest a floor loop.

Example from the algorithm description: 20 m of floor route + 2 × 0.3 m loops → (20 + 0.6) × 1.1 = 22.7 m → 25 m cable.

Standard lengths and segments

Each cable type has its own list of standard lengths, e.g. DMX: 0.5, 1, 2, 3, 5, 10, 15, 20, 30, 50 m. The planner picks the shortest cable that is not shorter than the required length. When the required length exceeds the longest cable of that type, the plan joins segments: the longest one repeated, with the remainder covered by the shortest one that fits. Example: 60 m of CEE 32 A 5G6 cable is 50 + 10 m segments.

Signal types also have a recommended length, e.g. HDMI up to 15 m, Cat6 up to 100 m, DMX up to 300 m per line. Exceeding it gives a warning with a suggestion, e.g. SDI or HDBaseT for video, fiber or a switch along the way for network.

Accessories calculated from the plan

  • 2- and 5-channel cable ramps and low-profile ramps (from crossings of corridors and doors).
  • DMX terminator 120 Ω: one per DMX line.
  • Velcro ties and cable ties: from the length of cables along the truss.
  • XLR3 ↔ XLR5 adapters and Schuko → TRUE1 / powerCON adapters based on connectors, etherCON couplers for joining Cat segments.

Cables in the project report

The Cabling section in the project report is built from the plan. You can also open it from the More cabling actions menu → Cabling report. It contains:

  • Facts: number of cables, total length, cable weight, weight on trusses, number of cable ramps.
  • Family table: number of cables and length in each family.
  • Cable list: code, type, from, to, route, length, segments, optionally assignment (circuit, DMX line). The cable code in the report opens that cable in the Cabling panel.
  • Cable summary (type × length): how many pieces of each standard length, and weight.
  • Accessories and Route plan.

The weight of cables on trusses is added to the structure loads. When cables push a rigging point above 80 % of its allowed load, a warning appears with a Show structure button.

Did not find the answer?
Describe the problem and we will reply with a solution or add an article.