StageDesigner

Circuits and L1–L3 phase distribution

How the planner splits loads into 16 A circuits, links fixtures into daisy chains and spreads circuits across phases. How to change a phase by hand, move a load and lock a circuit.

4 min read
Documentation contents ▾

A circuit in the plan is an outgoing feed from a distribution board with a circuit breaker and RCD. The planner sets up 230 V circuits as C16 with a 30 mA type A RCD, and 3-phase feeds to distribution boards with a 300 mA RCD. Every circuit has a code O-01, O-02… and a phase L1, L2, L3 or 3-phase.

Daisy chains

The planner links fixtures with a power thru output (e.g. TRUE1, powerCON) into daisy chains: one after another along the truss, or to the nearest fixture on the floor. A chain ends when it reaches the allowed circuit load, the limit of fixtures in the chain or the thru output current from the fixture profile. A fixture without a thru output gets its own cable.

The allowed load of a 16 A circuit is current × 230 V × cos φ × load threshold. With the default 80 % threshold and cos φ 1 this gives 2,944 W, and with cos φ 0.95 (LED fixtures) 2,797 W. You change the load threshold in the wizard: Rules → Circuit load up to (50–100 %).

The number of chains is rounded up to a multiple of three and fixtures are split evenly, so the phases are loaded similarly. Example from the algorithm description: 24 fixtures at 850 W get 9 circuits instead of 8 circuits of 3 fixtures, 8 fixtures per phase.

cos φ of loads

Circuit current is calculated from power and cos φ: I = P / (230 V × cos φ). Default values:

Loadcos φ used in the app
LED fixtures and LED screens0.95
Electronic devicesfrom the device catalog, 0.9 without data
Other (weight table, incandescent fixtures)1.0

That is why currents in the Power tab can be higher than power divided by 230 V alone would suggest.

Phase distribution

The planner distributes circuits in two stages. First within each distribution board: screen circuits one by one onto the least loaded phase, the rest from largest down onto the least loaded phase. Then for each distribution board it picks the phase assignment that best balances the upstream distribution boards and the whole power connection. Padlocked circuits keep their phase and count toward the load.

Power tab: Phases group

The L1, L2, L3 bars show phase current against the planned phase current of the power connection (80 % of rated). A bar turns yellow above 80 % of this scale and red above 100 %. The Balance phases button arranges the circuits again; it is inactive when the phases are already as even as the circuits allow.

The imbalance warning appears when the difference between the most and least loaded phase exceeds 10 % of the planned phase current of the power connection and also 5 A. Above 20 % it is an error. The Balance phases button on the warning only appears when the planner can arrange the phases better.

Changing circuits by hand

Below the Phases group are the distribution boards with their circuit lists. A circuit row shows the code, phase, power, current, load percentage with a bar and the number of loads. Clicking the circuit code expands the list of loads.

Change phase
The phase dropdown in the circuit row. The 3-phase option is only available for circuits fed by a five-core cable.
Move a load
Drag the load onto another circuit or use the Move to O-xx (L1) menu. The chain is cut and the load gets a new cable from the target circuit. A screen has a separate circuit for each power input, so you cannot move it.
Split circuit
Circuit actions menu. Available with at least two loads.
Lock circuit
Circuit actions menu. The circuit gets a padlock: the planner does not change its phase or loads when recalculating. Release to auto removes the lock.

Circuit warnings

WarningWhenFix
Circuit over limitCircuit current higher than the rated current of the protective device (error).Split circuit
Circuit loaded above recommendedAbove the wizard threshold, 80 % by default. With a single load, splitting does not help and there is no button.Split circuit
Phase imbalancePhase difference above 10 % of the planned phase current of the power connection and above 5 A.Balance phases
Neutral conductor with switch-mode power suppliesMore than half of the power comes from switch-mode power supplies, and the cable feeding the distribution board is loaded above 70 % of its current-carrying capacity. The neutral conductor can carry up to approx. 1.7 × the phase current.Show
Did not find the answer?
Describe the problem and we will reply with a solution or add an article.