A circuit in the plan is an outgoing feed from a distribution board with a circuit breaker and RCD. The planner sets up 230 V circuits as C16 with a 30 mA type A RCD, and 3-phase feeds to distribution boards with a 300 mA RCD. Every circuit has a code O-01, O-02… and a phase L1, L2, L3 or 3-phase.
Daisy chains
The planner links fixtures with a power thru output (e.g. TRUE1, powerCON) into daisy chains: one after another along the truss, or to the nearest fixture on the floor. A chain ends when it reaches the allowed circuit load, the limit of fixtures in the chain or the thru output current from the fixture profile. A fixture without a thru output gets its own cable.
The allowed load of a 16 A circuit is current × 230 V × cos φ × load threshold. With the default 80 % threshold and cos φ 1 this gives 2,944 W, and with cos φ 0.95 (LED fixtures) 2,797 W. You change the load threshold in the wizard: Rules → Circuit load up to (50–100 %).
The number of chains is rounded up to a multiple of three and fixtures are split evenly, so the phases are loaded similarly. Example from the algorithm description: 24 fixtures at 850 W get 9 circuits instead of 8 circuits of 3 fixtures, 8 fixtures per phase.
cos φ of loads
Circuit current is calculated from power and cos φ: I = P / (230 V × cos φ). Default values:
| Load | cos φ used in the app |
|---|---|
| LED fixtures and LED screens | 0.95 |
| Electronic devices | from the device catalog, 0.9 without data |
| Other (weight table, incandescent fixtures) | 1.0 |
That is why currents in the Power tab can be higher than power divided by 230 V alone would suggest.
Phase distribution
The planner distributes circuits in two stages. First within each distribution board: screen circuits one by one onto the least loaded phase, the rest from largest down onto the least loaded phase. Then for each distribution board it picks the phase assignment that best balances the upstream distribution boards and the whole power connection. Padlocked circuits keep their phase and count toward the load.
Power tab: Phases group
The L1, L2, L3 bars show phase current against the planned phase current of the power connection (80 % of rated). A bar turns yellow above 80 % of this scale and red above 100 %. The Balance phases button arranges the circuits again; it is inactive when the phases are already as even as the circuits allow.
The imbalance warning appears when the difference between the most and least loaded phase exceeds 10 % of the planned phase current of the power connection and also 5 A. Above 20 % it is an error. The Balance phases button on the warning only appears when the planner can arrange the phases better.
Changing circuits by hand
Below the Phases group are the distribution boards with their circuit lists. A circuit row shows the code, phase, power, current, load percentage with a bar and the number of loads. Clicking the circuit code expands the list of loads.
- Change phase
- The phase dropdown in the circuit row. The
3-phaseoption is only available for circuits fed by a five-core cable. - Move a load
- Drag the load onto another circuit or use the
Move to O-xx (L1)menu. The chain is cut and the load gets a new cable from the target circuit. A screen has a separate circuit for each power input, so you cannot move it. - Split circuit
- Circuit actions menu. Available with at least two loads.
- Lock circuit
- Circuit actions menu. The circuit gets a padlock: the planner does not change its phase or loads when recalculating.
Release to autoremoves the lock.
Circuit warnings
| Warning | When | Fix |
|---|---|---|
| Circuit over limit | Circuit current higher than the rated current of the protective device (error). | Split circuit |
| Circuit loaded above recommended | Above the wizard threshold, 80 % by default. With a single load, splitting does not help and there is no button. | Split circuit |
| Phase imbalance | Phase difference above 10 % of the planned phase current of the power connection and above 5 A. | Balance phases |
| Neutral conductor with switch-mode power supplies | More than half of the power comes from switch-mode power supplies, and the cable feeding the distribution board is loaded above 70 % of its current-carrying capacity. The neutral conductor can carry up to approx. 1.7 × the phase current. | Show |