A cable route is a polyline in the scene with segments on the floor, on the truss, in the air and vertical. The planner calculates it on a floor grid with a 0.25 m cell, connected to the structure runs. It looks for the cheapest route: bends, climbing onto the truss and crossing corridors have a cost, while cells shared with other cables of the same group are cheaper.
Floor, truss, vertical drops
- Floor: the default path for cables between standing devices.
- Truss: fixtures and devices on the structure connect along its runs. With the
Route over audience via trussrule on (yes by default), a meter along the truss is cheaper than along the floor. - Vertical drops: the cable climbs onto and down from the truss at nodes and towers; height has its own cost.
- Audience: with the
Avoid audience seatingrule (yes by default), routes avoid tables, the dance floor and rows of chairs.
Bundles
Cables of the same group run together because cells already used by other cables are cheaper. Power bundles with power, signals with signals, and analog audio additionally avoids power cells. Power bundles affect the current-carrying capacity of conductors; the Separate cables fix routes the selected cables next to the bundle.
An XLR3 or multicore audio cable running at least 5 m within 30 cm of power gets a warning: move it 30 cm away or cross at 90°.
Corridors: what the planner avoids
The Corridors tab in the Cabling panel shows where the zones that cables avoid come from. Some are defined automatically from the venue layout plan: main guest walkways to the exits (from the evacuation analysis, from 20 people per walkway), emergency exits with a 3 m escape route, access to the stage stairs, backstage entrances and bar queues.
You draw the other zones yourself in the Draw in scene group:
| Zone | How it works |
|---|---|
| Circulation route | A walkway for guests or staff. Cables avoid it or cross it with a cable ramp. |
| Escape route | A route to an exit. Cables almost always avoid it, every crossing is a warning. |
| No-cable zone | No cables on the floor, e.g. a dance floor or guest entrance. Overhead along the truss is allowed. |
| Emergency exit | You mark the door opening with two clicks. Cables do not pass through the door, and 3 m on both sides is an escape route. |
- Open the
Corridorstab. - In the
Draw in scenegroup, choose the zone type. - Click the first corner on the floor, then the opposite one. For an exit: one edge of the door opening and then the other.
- The zone appears in the
Drawn zoneslist, where you can delete it.
The Show corridors in scene toggle turns on an overlay with a color legend: circulation route, escape route, no-cable zone and exit clearance, door, guest zone.
Cable ramps
When a cable has to cross a circulation route, an escape route or a door, the planner records a crossing and adds the accessory to the plan. Cables crossing the same walkway share one cable ramp.
| Accessory | When |
|---|---|
| 2-channel cable ramp | Walkways with foot traffic, up to two cables. |
| 5-channel cable ramp | Escape routes and bundles of more than two cables. Number of pieces from the walkway width and the number of cables. |
| Low-profile / door ramp | Thresholds and interior doors. |
Route warnings
| Warning | Fix |
|---|---|
| Cable passes through an emergency exit (error) | Recalculate route |
| Cable runs along an escape route (error) | Recalculate route |
| Cable lies in a no-cable zone | Recalculate route |
| Cables cross an escape route | Show |
| Cable drops from the truss above a walkway | Show: move the drop outside the escape route and circulation route |
| Fallback route (straight line) | Recalculate route / Recalculate routes or route it by hand |
| Cable ramps added (information with a list of locations) | Show |
Live routes when moving equipment
Equipment you move (a device, fixture, screen, control room, truss) pulls its cables along. While dragging, the app shows a preview: the nearest 60 planner cables get a full route, the rest and manual cables get a moved end. When you release, the new routes, lengths, cable ramps and accessories are saved in the same undo step as the move.
- Locked cables do not change.
- A cable drawn by hand keeps the middle of its route, only its end moves.
- Control room devices follow its anchor together with their cables.
You turn off recalculation in the More cabling actions menu → Recalculate routes when moving equipment. Routes then stay in place, and cables of devices moved by more than 0.5 m get the "outdated route" state with a Recalculate route button.
