Every device in the scene has a power draw and ports in the app: power, DMX, network, video and audio inputs and outputs. Based on this, the automatic planner proposes connections, routes cables across the floor and along trusses, picks standard lengths, groups loads into circuits and spreads them across phases. You can change every proposal by hand afterwards.

LED 5 × 2.5 mR163 AFOHESCAPE ROUTEno cables on the floorbridge over the routeL178 %L264 %L371 %ΔU max 2.9 %4 × 2.5 mm²230 VDMX
Cabling plan: power from distribution boards, DMX lines and routes in the scene.

Where to find the Cabling panel

You open the panel from the menu or from the panel list. Once the project has cables, the cabling layer toggle in the top bar also works (described in Cable layer in the scene).

ProjectCabling
ViewPanelsCabling

In an empty project the panel shows the No cabling state with two buttons: Plan cabling (the wizard) and Draw route (draw a cable by hand, shortcut J). Below is a collapsed section Corridors and no-cable zones: open it before your first plan to check what the planner will avoid.

Wizard: three steps with defaults

The wizard has three steps, but every field has a default value, so the Plan button works at any step. Getting from an empty project to a finished plan takes two clicks.

  1. Click Plan cabling in the Cabling panel.
  2. Step What to connect: choose the scope (Whole project or Selected) and the cable families. Each family shows how many connections the planner will add.
  3. Step Power connection and control room: choose the power connection or a generator and its location. By default the power connection sits behind the stage; use the Pick button to point to a location in the scene.
  4. Step Rules: length allowances, service loops, circuit load, voltage drop thresholds, DMX, routing and LED data rules.
  5. Click Plan. The planner calculates routes in the background and then immediately runs the fix loop (cross-sections, phases, distribution boards). The whole result is a single undo step.

Once a plan exists, the wizard is called Recalculate cabling and the button Recalculate. Step one then shows a notice: cables created by the planner will be replaced, while cables drawn by hand and locked cables stay.

Cable families

Cables are grouped into families. Each family has a color in the scene and a letter in the cable code (e.g. Z-01, D-03). By default the wizard plans all families except Control; a family with no connections is disabled in the wizard with a short explanation, e.g. "no DMX fixtures".

FamilyCode letterExample cable types
PowerZSchuko, TRUE1 and powerCON 3G1.5 / 3G2.5, CEE 16 A 1-phase, 6-circuit multipin 19G2.5
Power 400 VZCEE 16 A 5G2.5 and 5G6, CEE 32 A 5G6 and 5G10, CEE 63 A 5G16 and 5G25, CEE 125 A 5G35 and 5G50, Powerlock 400 A. Shown in the scene with its own color and a thicker line.
DMXDDMX XLR5 120 Ω, DMX XLR3 120 Ω, wireless DMX (dotted line, no standard lengths)
NetworkNCat6 etherCON, OM3 fiber opticalCON DUO, OS2 single-mode fiber
LED dataLLED data Cat6, LED data fiber
VideoWHDMI, fiber HDMI (AOC), DisplayPort, 3G-SDI, 12G-SDI, HDBaseT
AudioAXLR3 analog, analog multicore 24/8, Dante/AES50 over Cat, MADI coax, AES3, NL4 and NL8 speaker cables
ControlSIntercom / timecode XLR3, active USB

The planner picks the cable type from the connectors at both ends and from the route length. Examples from the selection rules: a 230 V power cable longer than approx. 14 m gets a 2.5 mm² cross-section instead of 1.5 mm², network and LED data over 100 m switch to fiber, HDMI over 15 m to an AOC cable.

What the panel shows after planning

Summary tiles
Power (load, number of circuits, power connection, L1–L3 currents), DMX (universes, lines, used channels), LED data (ports) and Cables (length, pieces, weight, cable ramps). Clicking a tile opens the matching tab.
Issues
Errors and warnings with a fix button. The first two are visible, the rest are under Show all issues. Described in Recalculate all and fixes.
Tabs
Cables, Power, DMX, LED Data, Corridors.
Toolbar
Recalculate all, the eye button (show or hide cables in the scene), the More cabling actions menu, the family filter and the Problems only toggle.
Footer
Draw route (J): draw a cable by hand.

More cabling actions menu

  • Planning rules…: reopens the wizard with the current settings.
  • Connect automatically (missing only): adds connections for equipment without cables, without touching existing ones.
  • Recalculate routes when moving equipment: turns live routes on or off. On by default.
  • Show connection diagram and Cabling report.
  • Delete cabling…: deletes the whole plan after confirmation. The devices in the scene stay, and the toast has an Undo button.

LED Data tab

For LED screens built from cabinets, the tab shows the cabinets and resolution, the number of data ports, the most heavily loaded port, the assigned processor and the screen's power. Below is a port map with numbers and the cabinet connection order. The default view is From back, the way technicians work when connecting; From front mirrors the columns. You set port headroom and the redundancy loop in the wizard, in the LED data group.

Typical workflow

  1. Place equipment in the scene: fixtures on trusses, screens, sound system. If possible, create a control room: the planner takes the console, LED processors and video sources from it.
  2. Check the corridors in the Corridors tab (or in the panel's empty state) and draw any zones the venue layout plan did not define.
  3. Run the wizard, choose the power connection and its location, click Plan.
  4. Review the issues. Whatever remains after recalculation is marked Needs decision.
  5. Correct by hand what you know from the venue: distribution board locations, routes through specific passages, phases of selected circuits. Lock the routes and circuits the planner should leave alone.
  6. After bigger changes in the scene, click Recalculate all.
  7. Generate the project report with the cable list, length summary and accessories.
Did not find the answer?